4 on 4 off schedule: four 12-hour shifts, then four days off

On a 4 on 4 off schedule you work four 12-hour shifts in a row, then get four days off, and the rhythm repeats every 8 days. With four crews alternating blocks of days and nights, a site is covered 24/7 and each person averages 42 hours a week.

Shift length
12 hours
Cycle
16 days
Average week
42 hours
Longest stretch
4 on / 4 off

Build your rotation

Crew
M
5
T
6
W
7
T
8
F
9
S
10
S
11
M
12
T
13
W
14
T
15
F
16
S
17
S
18
M
19
T
20
W
21
T
22
F
23
S
24
S
25
M
26
T
27
W
28
T
29
F
30
S
31
S
1
ADDDD····NNNN····DDDD····NNNN
B····NNNN····DDDD····NNNN····
CNNNN····DDDD····NNNN····DDDD
D····DDDD····NNNN····DDDD····
Day Night Off

The calendar only shows which crew works when. Describe your crews, roles, time-off and rules in plain English, and Smeno drafts a full schedule from this starting point, free. Check the draft before you share it.

How the 4 on 4 off rotation works

In the version shown in the calendar, each crew works 4 day shifts, has 4 days off, works 4 night shifts and has 4 days off: a 16-day cycle. Crews start 4 days apart, so every day has one crew on days, one on nights and two off.

  • Days 1–4: day shifts
  • Days 5–8: off
  • Days 9–12: night shifts
  • Days 13–16: off

Common variations

4 on 4 off describes the rhythm, not the shifts, so teams run it in different ways:

  • Alternating blocks: one block of 4 days, then a block of 4 nights, as above.
  • Fixed crews: two crews always on days and two always on nights, each on 4 on 4 off.
  • Split block: 2 day shifts, then 2 night shifts, then 4 days off, an 8-day cycle.

Hours, overtime and weekends

You work half the days of the year: about 182 or 183 shifts, 2,190 hours, 42 hours a week on average. Because the cycle is 8 days and the week is 7, your work days move one weekday later each cycle.

That drift means calendar weeks come in runs of 36-hour weeks and 48-hour weeks, averaging 4 overtime hours a week under the 40-hour rule. It also means weekends move: a crew gets 6 full weekends off in every 16 weeks.

The trade-off

The rule is easy to remember and the break always matches the work block. The cost is four 12-hour shifts back to back, 48 hours in 4 days, and NIOSH links 12-hour shifts to lower alertness and less sleep. The PowerDMS guide for police schedulers recommends watching fatigue over the four consecutive workdays.

Pros and cons

  • The simplest rule of any 24/7 rotation: 4 on, 4 off.
  • Every work block is followed by 4 full days off.
  • In the alternating version, everyone shares nights equally.
  • No 72-hour weeks, unlike DuPont.
  • Four 12-hour shifts in a row, 48 hours in 4 days.
  • Work days move through the week, so there are no fixed weekends off.
  • Four night shifts in a row in the alternating version.
  • 48-hour weeks bring overtime under the 40-hour rule.

Who it works for

  • Manufacturing
  • Healthcare
  • Security
  • Emergency services

FAQ

What is a 4 on 4 off schedule?

A shift pattern where you work four 12-hour shifts in a row and then have four days off. Four crews on staggered cycles keep a site covered 24 hours a day.

How many hours a week is 4 on 4 off?

42 hours on average with 12-hour shifts. Individual weeks are either 36 or 48 hours.

How many days a year do you work on 4 on 4 off?

About 182 or 183 shifts, half the days of the year, which is about 2,190 hours.

Do you get weekends off on 4 on 4 off?

Sometimes. The 8-day cycle drifts across the 7-day week, so a crew gets a full weekend off in 6 of every 16 weeks, never on a fixed pattern.

Is 4 on 4 off a good schedule?

It suits people who want long, regular breaks and a simple rule. It's hard on people who struggle with four 12-hour shifts, or four nights, in a row.

4 on 4 off vs DuPont: which is better?

Both average 42 hours a week with four crews. 4 on 4 off is steady: 4 on, 4 off, every time. DuPont has uneven blocks, one 72-hour week and a 7-day break every 4 weeks.